This is the continuation of project 3A ie. The distribution of the line of over 20km. Comprehensive testing was conducted after installation, including pressure testing and leak detection, to verify the integrity and functionality of the pipelines. These measures ensured that the distribution lines met quality and safety standards, providing a reliable water supply to the villages.