The project involved all civil works, pipe laying, and testing for a main transmission pipeline spanning a total of 40 kilometers.
Civil works included trench excavation, proper bedding preparation, and backfilling to ensure the stability and longevity of the pipeline. The pipes were carefully laid and jointed using industry-standard techniques to ensure a secure and efficient system.
Once installed, the pipeline underwent rigorous testing, including pressure tests and leak detection, to confirm its integrity and performance. These processes ensured that the pipeline met the required quality and safety standards, delivering a reliable solution for the transmission of water.