Water Supply and Sanitation project

Central and Western regions of Ghana

Project Details

Location

Central and Western regions of Ghana

Client

European Union Community Water/Sanitation Agency- Ghana

Year Completed

Project Type

Government

Delivery Method

Design-Bid-Build (DBB

Schedule

Overview

Project Description:

The project involved the construction of over 138 kilometers of HDPE transmission and distribution pipelines and essential civil works. This included trench excavation, proper bedding, pipeline laying, jointing, and backfilling to ensure stability and durability. Standpipes were installed at designated points to facilitate water distribution to communities. Careful attention was given to proper pipeline alignment and gradient to optimize water flow.

To confirm the reliability of the system, pressure testing and leak detection were conducted after installation. All work adhered to quality and safety standards, delivering a robust and sustainable water supply infrastructure.

Featured Projects

Get in touch

Have a question, or want to get in touch? We’d love to hear from you.
×