Project Description:
The project involved the construction of over 138 kilometers of HDPE transmission and distribution pipelines and essential civil works. This included trench excavation, proper bedding, pipeline laying, jointing, and backfilling to ensure stability and durability. Standpipes were installed at designated points to facilitate water distribution to communities. Careful attention was given to proper pipeline alignment and gradient to optimize water flow.
To confirm the reliability of the system, pressure testing and leak detection were conducted after installation. All work adhered to quality and safety standards, delivering a robust and sustainable water supply infrastructure.