The project involved the siting, drilling, construction, and pump testing of three boreholes. Concrete pads were constructed at borehole sites to provide stable foundations and support durability. Additionally, a limited water scheme was constructed at the APDO office to enhance water access and distribution.
The boreholes were strategically sited based on hydrogeological surveys to ensure optimal water yield. Pump testing was conducted to evaluate the boreholes’ performance and ensure reliable water output.
Concrete pad construction was carried out to protect the boreholes and provide a robust platform for further development. The limited water scheme at the APDO office was designed and constructed to improve water management and supply for the area.