Project Details

Location

Talensi and Builsa South Districts

Client

IWANG Project Catholic Relief Services (CRS)

Year Completed

Project Type

Government

Delivery Method

Design-Bid-Build (DBB

Schedule

Overview

The project involved the drilling, construction, and mechanization supervision of 23 boreholes, along with related works such as pad construction, pump testing, and water quality analysis.

Each borehole was drilled and constructed according to industry standards to ensure optimal water yield and structural integrity. Concrete pads were constructed at each site to provide a stable foundation and protect the boreholes.

Pump testing was conducted to evaluate the performance and efficiency of the boreholes, ensuring they met the required output specifications. Water quality analysis was carried out to ensure that the water extracted met safety and health standards.

Mechanization supervision ensured that the boreholes were equipped with the necessary pumps and systems for sustainable operation.