Construction of a 4-storey Drug & Pesticide Laboratory Project

Ghana Standard Authority

Project Details

Location

Ghana Standard Authority

Client

Year Completed

Project Type

Government

Delivery Method

Design-Bid-Build (DBB

Schedule

Overview

The scope included site preparation, foundation laying, and the erection of a reinforced concrete structure to ensure stability and durability. The four-story building was designed to meet the specific requirements of a laboratory environment, with provisions for specialized spaces and equipment 

Featured Projects

Get in touch

Have a question, or want to get in touch? We’d love to hear from you.
×