Hydrogeological Consultancy Service for Drilling in Central Region

Central Region

Project Details

Location

Central Region

Client

Ministry of Sanitation and Water Resource

Year Completed

Project Type

Government

Delivery Method

Design-Bid-Build (DBB

Schedule

Overview

The project involved the drilling, construction, and mechanization supervision of 90 boreholes, along with related works such as pad construction, pump testing, and water quality analysis.

Each borehole was drilled and constructed to meet industry standards, ensuring structural integrity and optimal water yield. Concrete pads were built at each site to provide a durable foundation and protect the boreholes from external damage.

Pump testing was conducted to assess the performance and reliability of the boreholes, ensuring they met the required output specifications. Water quality analysis was carried out to confirm that the extracted water complied with safety and health standards.

The mechanization supervision ensured that the boreholes were equipped with the necessary systems for efficient and sustainable operation.

Featured Projects

Get in touch

Have a question, or want to get in touch? We’d love to hear from you.
×