The project involved all civil and pipe works for a pipeline totaling 38 kilometers. Civil works included trench excavation, proper bedding preparation, and backfilling to create a stable foundation for the pipeline. The pipework encompassed the laying, jointing, and alignment of pipes to ensure an efficient and durable system.
Testing was conducted to verify the integrity and performance of the pipeline, including pressure testing and leak detection. These quality assurance measures ensured that the pipeline met the required standards for reliability and efficiency.